The driveway was poured today. The interior was painted a shade of beige and as promised, the granite
countertops went in as well. The floor tile has been started and the kitchen
backsplash will be started soon.


Driveway still drying.

Garage.

Front Entry.

Front entry/Study.

Hand rail stained (still wet) and trim painted.


Kitchen area with tile and
countertops. Still missing the cabinets over the
refrigerator area.

A peek a the granite
countertops.

Breakfast area floor tile.

Painted interior.

Utility room.

Master bath tile (more "reddish" color).


Gameroom closet (upstairs).

Bath 2 (upstairs).

Bath 3 (upstairs by media room).

Downstairs powder room/restroom.
No comments:
Post a Comment