We had our pre-drywall/sheetrock walk through today. We went over the plumbing, electrical outlets, pre-wiring, and other misc. things going on with the house lately. Much progress this week with the exterior. The stone is progressing on the back and sides. The first rough layer of the stucco is going on before they will put the stone on the front. This way the stucco won't drip all over the stone. They will put on another layer of stucco and then a final coat early next week before they paint the stucco. Between the stone and the stucco will be some red-like colored bricks for accent. The exterior stone and stucco will be done by about Wednesday. The drywall will go on the interior walls on Wednesday. The cabinets and doors are ordered and should be delivered by next weekend. The driveway should begin by the end of next week as well.