We had our pre-drywall/sheetrock walk through today. We went over the plumbing, electrical outlets, pre-wiring, and other misc. things going on with the house lately. Much progress this week with the exterior. The stone is progressing on the back and sides. The first rough layer of the stucco is going on before they will put the stone on the front. This way the stucco won't drip all over the stone. They will put on another layer of stucco and then a final coat early next week before they paint the stucco. Between the stone and the stucco will be some red-like colored bricks for accent. The exterior stone and stucco will be done by about Wednesday. The drywall will go on the interior walls on Wednesday. The cabinets and doors are ordered and should be delivered by next weekend. The driveway should begin by the end of next week as well.
Friday, May 29, 2009
Saturday, May 23, 2009
Sunday, May 17, 2009
Plumbing, Electrical, HVAC...
There is a whole lot of progress going on but it's mostly on the inside. All the electrical work is done and the plumbing is done (minus toilets, sinks, etc...). Even the network cables are in. The HVAC ducts and air handling units are in. Fireplace is in. Still waiting for the water heaters. I probably won't post as much until the drywall is in and you start to see cabinets and such. 
Fireplace

Water no. 1 heater closet in garage

Island in kitchen

View of ceiling from master bedroom

Fireplace

Water no. 1 heater closet in garage

Island in kitchen

View of ceiling from master bedroom
Wednesday, May 6, 2009
Dry In Almost Complete
Saturday, May 2, 2009